Solarsat guide
House rewiring cost and what to expect
A rewire is easiest to control when the electrical layout, building work and finishing responsibilities are agreed together. The cost is not determined by bedroom count alone. Access below floors, wall construction, occupancy and the number of circuits all matter. Establish what needs replacing before using published figures to set a provisional budget.
Phones and email Monday to Saturday, 8:30am to 6pm. Showroom visits by appointment.

Use cost ranges without combining unlike jobs
MyBuilder's guide updated in October 2026 gives a broad UK full-rewire range of £3,000 to £10,000, depending on the property and region. Less.co.uk November 2026 figures suggest £4,900 to £5,900 for a typical three-bedroom rewire and £1,500 to £3,000 for a partial one-floor rewire. These are typical 2026 guide figures, not Solarsat prices, and require owner checking before publication.
The ranges describe different scopes and are not additive quotation figures. Do not add a partial-rewire allowance to a three-bedroom figure to estimate a larger house. Establish circuit numbers, accessory quantities, access arrangements and finishing standards instead. Ask whether the price includes VAT, a consumer unit, testing, certification, waste removal and making good. Decorative fittings, specialist controls and building repairs may be separate even when the electrical replacement is described as complete.
Assessment comes before deciding the scope
An electrician's initial assessment helps identify the installation type, obvious defects and the likely extent of work. An Electrical Installation Condition Report, or EICR, is a formal inspection and test report on the condition of the existing installation within agreed limitations. It is not a design for a new layout, and it is not the certificate issued for the completed rewire.
A full rewire generally replaces the agreed fixed wiring and associated equipment throughout the property. A partial rewire retains some existing circuits while replacing others. Retained wiring must be assessed for compatibility and safety; a new kitchen does not automatically mean every cable elsewhere must go. Conversely, replacing visible sockets does not renew the wiring behind them. Ask the quotation to identify retained circuits, exclusions and any investigation still needed before the scope is final.
Plan sockets, data and entertainment together
Mark furniture positions before choosing socket locations. Consider beds, desks, kitchen appliances, cleaning equipment and seasonal use, not just the current extension leads. Agree switching positions and lighting groups room by room. Future equipment can justify spare capacity or accessible routes, but avoid paying for poorly defined provisions that cannot be used later.
Data cabling, television connections, speakers and other audio-visual wiring are easier to coordinate while floors and walls are open. Give each outlet a destination and purpose, and agree where central network or entertainment equipment will sit. The installer should plan appropriate separation between mains and communications wiring. Consider ventilation, access and spare draw routes where useful. Photograph concealed routes before covering them, and keep an agreed layout so second-fix positions do not depend on memory.
Understand first fix, second fix and making good
First fix typically includes cable routes, back boxes and concealed wiring before finishes are completed. Chasing masonry creates dust, while lifting floors can disturb carpets and boards. Second fix fits the sockets, switches, lights and other accessories once the relevant surfaces are ready. Testing and commissioning complete the electrical work, with checks also needed during installation.
Agree who patches chases, repairs ceilings, reinstates floors and decorates. Making good can mean a basic fill rather than a paint-ready surface, so request a written description. Replacement flooring and decorative repairs can materially change the overall budget. Coordinate plastering and drying time with the electrician's return visit. Changing accessory positions after plastering means opening finished work again. If finishes or fittings are supplied by you, check dimensions and delivery dates before the first-fix layout is fixed.
Living at home and mistakes to avoid
An occupied rewire needs a specific access and temporary-supply plan. Furniture may need moving repeatedly, and power, lighting or cooking facilities can be interrupted. Working room by room may be possible, but it can add time and does not remove the need for safe isolation. Discuss children, pets, mobility needs and home working before agreeing a programme.
Avoid leaving the layout to decisions made while walls are being chased. Late changes disrupt both cost and sequencing. Do not cover new wiring before required checks, or assume older finishes can be disturbed without assessment. Suspected asbestos-containing materials need appropriate advice before drilling or removal. Pack sensitive belongings, agree daily clear-up arrangements and establish who can approve variations. A written change record is more reliable than several separate conversations with different trades.
Professional delivery and the final paperwork
Use a competent electrician to design, install and test a rewire. This is not suitable DIY work: circuit design, protective measures and verification need technical judgement and specialist instruments. Where the initial condition is uncertain, commission the appropriate investigation rather than accepting a fixed promise based only on the number of rooms.
The completed installation should have an Electrical Installation Certificate with relevant schedules and test results. In England and Wales, a rewire normally involves notifiable work under Building Regulations; confirm the compliance route and responsibility before starting. Requirements differ elsewhere in the UK. At handover, review the circuit labels, controls and any equipment instructions. Record unfinished items, obtain the agreed layout information and keep all certificates safely. Final decoration should follow confirmation that the electrical work is complete.
Source: MyBuilder house rewiring guide updated Oct 2026 and Less.co.uk published guide figures Nov 2026. Owner check required before publication: verify prices, scope and dates against the original guides. These are not Solarsat prices or quotation figures.
Have a question about your own property? Contact our Mildenhall team.
Related services
Services this guide covers

Electrical, solar and EV charging
Electrical repairs, maintenance and installations, plus EV chargers, solar PV panels and battery storage.
Find out more
Data and network cabling
Wired network sockets, data cabinets and structured cabling for offices and homes, planned for growth and easy to maintain.
Find out more
Audio-visual and home cinema
TV wall mounting, media walls, home cinema, multi-room music and commercial AV, designed and installed by our own team.
Find out more
FAQs
Frequently asked questions
Want advice for your own home or business?
Call our Mildenhall team or send an enquiry and we will talk through the options.
Enquiries
Ask us a question or get a quote
Tell us a little about your property and what you need. We will get back to you to talk it through.
- 01638 515551
- info@solarsat.co.uk
- Phones and email Monday to Saturday, 8:30am to 6pm
- 8 High Street, Mildenhall, Suffolk IP28 7EQ. Showroom visits by appointment.
